






Vesgantti 38.5" Accent Chair with Movable Ottoman, Comfy Corduroy Armchair with Spring Cushion, Reading Chair with Ottoman, Modern Single Sofa for Living Room, Bedroom and Apartment, Dark Gray
US$467.98
Arrives as soon as ✓ Free shipping — over $200Description
Product Details Color:38.5" - 1 Seater & Ottoman Dark Gray Pattern:Solid Size:38.5" - 1 Seater & Ottoman Item Dimensions:31.5 x 38.5 x 35 inches Item Weight:87.3 pounds Maximum Weigh...
Delivery & Returns
Free shipping over $200
Orders of $200 or more ship free. No code needed.
Reviews
Nookari
You might also like
ACMEASE
67” Chenille Loveseat Sofa w/Comfortable Back Cushions, Brown
US$503.98
Jarenie
Living Room Furniture Sets, L Shaped Couch and Loveseat and Chair, Sofa Set
US$1,177.16
HOMYHOMEY
Oversized Sectional Couches
US$2,222.98
MAXYOYO
Maxyoyo Folding Sofa Bed, Convertible Chair Bed with Pillow
US$206.98
UPYOOE
111'' Sleeper Sofa Bed Full Size, Corduroy Modular Sectional Sofa, Green
US$881.96
URRED
Oversized Modular Sectional Sofa
122"
US$1,367.98
AMERLIFE
Amerlife 4-Piece Living Room Furniture Set, 70" TV Stand for TVs up to 80", Coffee Table & 2 End Tables, Modern Table Set with Large Drawers & Curved Edges, Black
US$719.98
Joaxswe
Coffee Table Sets
US$611.98
feliz home
Small Boneless Couch, Boneless Loveseat Convertible Sofa Bed Sleeper Sofa Couch Bed with 2 Pillows, Corduroy Folding Floor Futon Foldable Boneless Couch for Living Room, Guest Room, Small Space, Beige
US$341.12
feliz home
Boneless Loveseat Sofa Bed, Tri-Folding Convertible Futon Sleeper with Handle & Side Pockets, 54'' Boneless Couch with Hook and Loop No Assembly for Small Space,Living Room & Bedroom
US$316.53
VYUXWO
108" Oversized Cloud Sectional Couch, Comfort U Shaped Boneless Couch for Living Room, Extra Deep Seats No Assembly, Modular Sofa, Corduroy (Dark Grey, 2 Seater + Left Facing Chaise + Ottoman)
US$809.98
Tykacna
Boneless Loveseat Sofa Bed,Small Couch Bed Futon Sleeper Sofa,Convertible Pull Out Couch with Removable Armrests Backrest,Corduroy Folding Floor Boneless Couch for Living Room,Small Space,Black
US$332.17
More options
Product Details
- Color:38.5" - 1 Seater & Ottoman Dark Gray
- Pattern:Solid
- Size:38.5" - 1 Seater & Ottoman
- Item Dimensions:31.5 x 38.5 x 35 inches
- Item Weight:87.3 pounds
- Maximum Weight Recommendation:440 pounds
- Included Components:Cushion, Ottoman
- Number of Items:1
- Unit Count:1 Count
- Model Name:Accent Chair with Movable Ottoman
- Model Number:Accent Chair with Movable Ottoman
- Form Factor:Upholstered Armchair with Ottoman
- Shape:Rectangular
- Theme:Modern
- Additional Features:Back Support, Ergonomic, Removable Ottoman, Space Saving, Upholstered
- Room Type:Bedroom, Dressing Room, Home Theater, Living Room, Office
- Age Range Description:Adult
- Indoor Outdoor Usage:Indoor
- Number of Packs:1
- Manufacturer Part Number:Accent Chair with Movable Ottoman
- Reclining Position Count:1
- Assembly Instructions Description:Easy 30-min assembly without additional tools
- Back Style:Cushion
- Style Name:Modern
- Arm Style:Track
- Leg Style:Straight Leg
- Item Dimensions D x W x H:31.5"D x 38.5"W x 35"H
- Seat Depth:20.9 inches
- Item Depth:31.5 inches
- Material Type:Corduroy Fabric, Wood
- Frame Material Type:Wood
- Seat Material:Foam
- Fill Material:Foam
- Upholstery Fabric Type:Corduroy
About this item
- Accent Chair with Ottoman - This versatile single-seater sofa suits living rooms, bedrooms, or studies, with a sleek design that fits modern and traditional decor. Paired with a movable ottoman, it offers extra comfort for leg support—perfect for reading, watching TV, or unwinding, letting you stretch out and relax
- Ergonomic & Comfortable - The spring cushions of this reading chair with ottoman absorb the impact of daily use, preventing rapid wear and tear and extending the life of the footstool. With a 20.9-inch seat depth, its generously sized seat offers ample support for both sitting and propping up feet, enhancing relaxation with exceptional pressure relief that makes every moment feel effortlessly luxurious
- FSC Certified Solid Wood - Made with materials from well-managed forests that support sustainable forestry practices. This accent chair is known for its sturdiness and solidity, with a maximum weight capacity of 440lbs. Additionally, the single sofa chair features non-slip protective backing on the bottom of the legs, providing stability and preventing damage to flooring
- Durable Corduroy Fabric - This corduroy sofa chair features distinct parallel ridges for a smooth, plush feel. Its velvety surface and modern design exude luxury, while the thick, wear-resistant build ensures lasting comfort. Available in four colors—note slight hue variations due to monitors and lighting
- Shipped in 2 Separate Packages - kindly allow for their arrival at different times. Easy 30-min assembly without additional tools. Cushions take 24-48 hours to fully recover due to compressed packaging. You can pat the cushion to make it fluffy and feel better.
Shipping Policy
Nookari ships from the United States.
Most orders leave the warehouse within 1 business day and arrive in 2–7 business days.
- Free shipping on orders of $200 or more, applied automatically
- Otherwise shipping is a flat $6.90
- Your tracking number is emailed as soon as your order ships
- We currently ship to the lower 48 United States
Return policy
30-day returns.
If it's not right for the room, you have 30 days from delivery to send it back, and Nookari will email you a return label. Return shipping fees may apply depending on the item's size, weight, and shipping location, and are deducted from your refund.
How it works
- Email us at support@nookari.com with your order number.
- We send a return label within 1 business day, along with the return shipping cost (if any) so you can decide.
- Your refund goes back to your original payment method within 10 business days of the carrier scan.
Items should be unused, unassembled, and in their original packaging. Damaged or defective on arrival? Send a photo and Nookari replaces or refunds immediately, return shipping on us, and in most cases you won't need to send anything back.








Follow us →